The overall content for the semester is industrialized construction.
This semester I have been working /studying on building components that are developed from a factory and can be assembled on site. A prefabricated component to the building which is I concentrated on Sandwich Wall. However, All Phase in this project is performed as professional process from Proposal Phase, Scheme Phase, Detail Design, Biding Phase and Project Hand-over phase.
Furthermore, I am also guided about 80/20 concept, that 80% of the construction will take place at the factory and 20% of the construction will take place on site, as well as the planning of the building site can take place as LEAN - planning and management.
Sport Hall
![]() | ![]() | ![]() | ![]() | ![]() |
---|---|---|---|---|
![]() | ![]() | ![]() | ![]() |




The hall has been placed on a lot sloping toward the south of aalborg city , the curve shape roof configured to respond to the given urban and topographic determinants. The perimeter around the hall is designed to establish a connection between the school and the lower plateau the parking in front lot also for the school bus and surrounding the complex, a series of green spaces were planned with Eco protection strategy.




Design Workshop









Fire Safety Plan




Ventilation System


Tender
Construction and Production Phase


Production Drawings and Planning

![]() | ![]() | ![]() | ![]() |
---|
QA & QC (Production)
Times and Cost